Saturday, April 27, 2013

Power Shutdown areas in Chennai on Tuesday April 30 2013



Below are the details of the Power Shutdown areas in Chennai on Tuesday April 30 2013.



Power Shutdown areas in Chennai on Tuesday April 30, 2013

Power shut down in Kovilambakkam Area on April 30 2013 (Tuesday)

Kovilambakkam, Nanmagalam, S.Kolathur, Eachangadu, Self Help Indl. Estate, Max Worth nagar, Chettinad Enclave, Medavakkam main road, Vadakkupattu, Vellakkal.




Power shut down in Tambaram Area on April 30 2013 (Tuesday)
Entire East Tambaram, Poondi Bazaar, Part of Irumbuliyur, M.E.S.road, Velachery main road (East Tambaram), Camp road Junction, Part of Tambaram Sanatorium East, Part of Chitlappakkam, IAF Station..


Power shut down in Seven Wells Area on April 30 2013 (Tuesday)

Part of Mannady, Part of Broadway, Amman koil st, Anaikaran st, Periyannan st, Nattu pillaiyar st, Krishna Iyyer st, Arumugam st, Govindhappa Naicken st, M.K.garden, Seenu Mudhali st, Seenu Iyer st, Girigori st, Veerasamy st, Paramananthan st, Barracks st, P.V.Iyer st, Sambu Iyer st, Thatha Muthiyappan st, Ramakrishnan st, P.G.Church st, BRN garden, Shanmuga Mudhali st, Pidariyar st, Shanmugarayan st, Thaiappan st, Asirvathapuram, Hacker Jockson st, K.N. Tank st,Kuppier st, K.N. Agraharam st, Ayalur Muthiah st, Nammalrar st, V.V. Koil st, Mullah sahib st, Amman koil st, nambuliar st, wahermen ali st, Jill st, Coral Merchant st, Ramasamy st, Malayappan st, St. Xavier st, Mint st, Mangammal st & lane, Vaithiyanathan st, Seven Wells st, K.N.Agaraharam, Kuppaiya st, Venkatraman st, Kondaliyer st.



Power shut down in Almathy Area on April 30 2013 (Tuesday)

Alamathy, Boochi Athipet, Karanipettai, Edapalayam Vanian Chatram, Guruvoyal, Maagaral kandigai, Ayillachery, Agaram Kandigai, Sethupakkam, Vellanoor.





Power shut down in Pondeswaram Area on April 30 2013 (Tuesday)

Pondeswaram, Veerapuram, Arakambakkam, Vellachery, Kadhavur, Karlapalayam, Kilkondaiar, Komakkambedu, Magaral, Thamaraipakkam, Koduvalli.



Power shut down in Royapuram Area on April 30 2013 (Tuesday)
East & West Kalmandapam road, S.N.Chetty road, Mosque Pudumanai kuppam, New Kamaraj nagar, C.G.colony, Vinayagapuram, Tondiar Nagar, Kasipuram A & B block, Singaravelar nagar, Indra nagar, GM Pettai, Periya Thambi st, Flag Staff st, Lotus Ramasamy st, AJ colony, Kasima nagar, Kasigarden, Shiek Maistry st, Hussian Maistry st, Fakir st, Part of Grace garden, Madha Chruch road, East Madha Church st, NRT road, Railway Press, Ramar st, Mariya doss st, Thambu chetty st, Lingu chetty st, Ibrahim st, Mettu st, Adhiyapatham st, Angappanayakan st, Marakayar shahib st, Sultan st, Meerali st, Velayutham st, Kummalaamman koil st, Part of TH road, Nagorar Thottam.



Power shut down in Rajbhavan Area on April 30 2013 (Tuesday)
Tamilnadu Housing Board, Raj Bhavan colony, Kannigapuram area, Periyar nagar, Ambedkar nagar, Indira Gandhi nagar, Vandiakaran road, Nehru nagar, kamarajapuram area, Part of Mount road, Muthiyal st, Renganathan st, Basiyam layout, Narasingapuram (part), Velachery road, Sardar Patel road, Race course road, Chakrapani road.


0 Comments: